Date
|
Hours
|
Work Log Summary

|
Details

|
03-11-2012
|
2.00
|
Oil Tank Breather
|
Details
|
|
|
01-23-2012
|
8.00
|
Cabin Heat
|
Details
|
|
|
01-16-2012
|
1.00
|
Timed Engine
|
Details
|
  |
|
01-08-2012
|
4.00
|
Heater Valve
|
Details
|
|
|
10-22-2011
|
8.00
|
Lots of small stuff that you cannot see
|
Details
|
|
|
09-03-2011
|
8.00
|
Install Oil Cooler and Lines
|
Details
|
|
|
08-30-2011
|
2.00
|
Install Plugs on Fuel Indicator and Oil Line Fitti
|
Details
|
|
|
07-23-2011
|
5.00
|
Install Cooling Fan/Clutch Drum
|
Details
|
|
|
06-28-2011
|
7.00
|
Rewiring
|
Details
|
|
|
06-23-2011
|
1.00
|
Engine Lift
|
Details
|
|
|
06-20-2011
|
3.00
|
Engine Lift Fixture
|
Details
|
|
|
06-18-2011
|
4.00
|
Sheet Metal and Engine Lift Fixture
|
Details
|
|
|
06-13-2011
|
2.00
|
Install Sheet Metal
|
Details
|
|
|
06-09-2011
|
5.00
|
Assemble Engine
|
Details
|
|
|
06-04-2011
|
5.00
|
Engine Dry Sump Conversion
|
Details
|
  |
|
05-30-2011
|
1.50
|
Rod Ends
|
Details
|
  |
|
05-29-2011
|
1.50
|
Assemble Fuel Selector Valve
|
Details
|
|
|
05-28-2011
|
1.50
|
Finish Intake Manifold and Valve Covers
|
Details
|
 |
|
05-25-2011
|
1.00
|
Make Nipples for Valve Cover Drains
|
Details
|
 |
|
05-21-2011
|
3.00
|
Adjust Intake and Add Oil Drains to Valve Covers
|
Details
|
|
|
05-18-2011
|
3.00
|
Intake Manifold
|
Details
|
|
|
05-16-2011
|
1.50
|
Sump Block off Plate
|
Details
|
|
|
05-15-2011
|
3.00
|
Dry Sump Conversion
|
Details
|
|