KitLog pro

Powered By Kitlog Pro v2.0

Bills Safari Adventure
' style=
Date:  6-28-2011
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Rewiring

Two steps forward one step back. Stayed home and worked on the ship all day and undid a lot of stuff. For several reasons I decided that the RDAC and IOX units needed to be relocated. Pain in the ass but I have much better clearance and shorter runs.

I intended to get all of the engine sensors hooked up but that did not go well. Got Mag #1 done but Mag #2 is going to drive the governor with the Tach output. Because of this I need to have the governor wiring harness in place. To do that I need to mount the governor computer so the wiring runs are the proper length.

The wiring is a rat's nests so I am disconnecting related wires and bundling them together in small, logical groupings. Many will need to be shortened. Found some more inconsistencies in the wiring schematic, had to call Sean for clarification.

I am tired of wiring.
' style=

Old Location

Old Location

' style=

New Location

New Location

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.