Powered By Kitlog Pro v2.0
306TD Web Site
RV-12is
Empennage
Work Logs Found:
61
Category Work Time:
202 Hours
Date
Hours
Work Log Summary
Details
03-20-2022
0.25
Completed Service Directive SD-00001
Details
03-14-2022
0.25
Finished all but clevis pin
Details
03-13-2022
0.50
Started disassembly of Servo Motor for Service Dir
Details
03-12-2022
3.50
Tailcone Skin Stiffening Clips SB00053
Details
01-20-2020
4.50
Empennage Kit Complete - Stabilator Fairing Final
Details
01-19-2020
2.00
Stabilator Tip Fairings
Details
12-24-2019
6.00
Stabilator Tip Fairings
Details
12-22-2019
5.00
Attach Trim Servo Assembly to Tail Cone
Details
12-21-2019
5.00
Pitch Trim Servo Motor Wiring and Pushrod assmebly
Details
11-27-2019
2.00
Start Servo Tray
Details
11-26-2019
8.00
Stabilator Assembly Attachment to Tailcone
Details
11-26-2019
1.00
2nd Day Entry Safety Wire AST Hinge Pins
Details
11-24-2019
2.00
V-Stab Assembly and Rudder Attachment
Details
11-24-2019
4.00
Completed Vertical Stabilizer Modifications for IF
Details
11-09-2019
3.00
V-Stab Tip Fairing Modification for VOR Antenna
Details
11-09-2019
2.50
Empennage Fairing Installation
Details
10-27-2019
4.50
Completed Tailcone
Details
10-20-2019
5.00
Tail Cone Skin Riveting and Top Skin Prep
Details
10-19-2019
1.00
Upper Skins and Snap Bushings
Details
10-19-2019
1.00
Static Air System and Aft Pitot Line
Details
10-19-2019
4.00
Routing Pull Strings for Control Cables and Static
Details
10-13-2019
8.00
Started Assembling the Tail Cone
Details
10-13-2019
0.50
Continuation of previous log entry
Details
10-09-2019
2.50
Fit Stabilator Assembly to F-1211 Assembly
Details
10-05-2019
6.00
Completed Fuselage Bulkhead Assembly
Details
09-29-2019
3.50
Fuselage Bulkhead Continuation
Details
09-28-2019
4.50
Fselage Bulkhead
Details
08-31-2019
5.00
Continued F-1211G and started Bulkhead
Details
08-24-2019
5.00
Fabricate F-1211G Tail Skid Bracket
Details
08-18-2019
5.50
Preparing and Assembling Tail Cone Frames
Details
08-17-2019
5.00
Preparing Tail Cone Skins
Details
03-24-2019
1.00
Attach aft skins HS-1217
Details
03-23-2019
6.00
Completed Stabilator Assembly
Details
03-23-2019
2.00
Attach Skin Splice and Aft Ribs
Details
02-15-2019
6.00
Horizontal Stab Skin Installation
Details
02-02-2019
1.00
Primed interior surfaces of the Main Horizontal St
Details
01-20-2019
1.00
Preparing HS-01201-1 Main Skins
Details
12-29-2018
6.00
Complete Stabilator Skeleton Assembly
Details
12-25-2018
2.00
Stab Hinge Drilling and Stabilizer Rib Preparation
Details
12-24-2018
3.00
Horizontal Stabilator Ribs and Rib Clips
Details
12-23-2018
2.00
Continuing Horitontal Stabilator
Details
12-23-2018
5.00
Continued Spar Box Assembly
Details
12-22-2018
6.00
Rebuild Anit Servo Tabs
Details
12-15-2018
4.00
Attaching Fwd and Aft Spar to Spar Cap Assembly
Details
12-08-2018
6.00
Begin Working on Stabilator
Details
12-02-2018
2.00
Anti Servo Tabs first attempt, scrapping work
Details
12-01-2018
1.25
Started Building Anti Servo Tabs
Details
11-17-2018
2.50
Completion of Rudder Skeleton Assembly
Details
11-17-2018
4.50
Completed Rudder Assembly
Details
11-16-2018
1.25
Rudder Skeleton Assembly
Details
11-14-2018
1.50
Rudder Spar, Spar Caps, and Hinge Prep
Details
11-10-2018
7.00
Completed Vertical Stabalizer Section Six
Details
11-09-2018
1.00
Vertical Stabalizer Front Skin Remove Waste Materi
Details
11-09-2018
3.00
Completed V-stab Skeleton Assembly
Details
11-07-2018
0.75
Final Prep & Primed VS1202 and VS1212A-L&R
Details
11-05-2018
0.75
Riveted Upper Spar both Left and Right
Details
11-04-2018
4.00
Riveted Rudder Hinges and Final Drilled Spar Caps
Details
10-13-2018
1.50
Upper and Lower Hinge Assemblies
Details
10-13-2018
4.00
Spar and Spar Cap Preparation
Details
10-07-2018
3.50
Completed Inventory of Subkits 1-6
Details
10-06-2018
2.00
Unpacking Empennage Kit and Inventory of Parts
Details
SITE NAVIGATION
Contact Builder
RV-12is Home
Category
# Logs
# Hours
All
166
634
Avionics
2
3
Empennage
61
202
Fuselage
59
232
Miscellaneous
2
7
Wings
42
190
Copyright © 2001-2025 Matronics. All Rights Reserved.