Powered By Kitlog Pro v2.0
Hans building site
RV-4
All
Work Logs Found:
25
Category Work Time:
617 Hours
Date
Hours
Work Log Summary
Details
06-01-2013
40.00
Painting wings and tail sections
01-08-2012
50.00
Throttle & mixture control
Details
09-12-2011
1.00
Exhaust pipe suspension
Details
10-06-2010
1.00
Engine breather connection
Details
05-08-2010
15.00
Fairing phase 2
Details
05-01-2010
20.00
Faring phase 1
Details
03-30-2010
10.00
Spinner #2
Details
03-23-2010
8.00
Oil separator
Details
03-17-2010
10.00
Battery tray
12-23-2009
10.00
Spinner #1
10-01-2009
5.00
Intercylinder baffle
10-01-2009
50.00
Baffle
10-24-2008
10.00
Fairings, fuselage to gear legs
Details
08-12-2008
10.00
Cowling hinge pin
Details
06-17-2008
10.00
Cowlings & cheeks installed
06-04-2008
10.00
Air inlet duct
06-02-2008
10.00
Engine cowling halves fitted
05-28-2008
10.00
Engine cowling front
Details
04-21-2008
10.00
Engine upper cowling installation
03-27-2008
10.00
Fairing, wheel pant to leg, right
Details
03-19-2008
10.00
Fairing, wheel pant to leg, left
03-11-2008
10.00
Wheel pants
Details
10-01-1994
99.00
Skeleton assembled
11-20-1992
99.00
Ribs in jig
10-08-1992
99.00
Right wing
SITE NAVIGATION
Contact Builder
Squire Home
Jodel Home
RV-4 Home
Category
# Logs
# Hours
All
25
890
Electrical
1
10
Empennage
2
35
Engine
8
295
Fuselage
11
299
Paint
1
40
Wings
2
211
Copyright © 2001-2025 Matronics. All Rights Reserved.