KitLog pro

Powered By Kitlog Pro v2.0

Hans building site
Work Logs Found: 25
Category Work Time: 617 Hours
 Date
Hours
Work Log Summary

Details

 06-01-2013
40.00
Painting wings and tail sections
       

 01-08-2012
50.00
Throttle & mixture control
Details
       

 09-12-2011
1.00
Exhaust pipe suspension
Details
       

 10-06-2010
1.00
Engine breather connection
Details
       

 05-08-2010
15.00
Fairing phase 2
Details
       

 05-01-2010
20.00
Faring phase 1
Details
       

 03-30-2010
10.00
Spinner #2
Details
       

 03-23-2010
8.00
Oil separator
Details
       

 03-17-2010
10.00
Battery tray
       

 12-23-2009
10.00
Spinner #1
       

 10-01-2009
5.00
Intercylinder baffle
       

 10-01-2009
50.00
Baffle
       

 10-24-2008
10.00
Fairings, fuselage to gear legs
Details
       

 08-12-2008
10.00
Cowling hinge pin
Details
       

 06-17-2008
10.00
Cowlings & cheeks installed
       

 06-04-2008
10.00
Air inlet duct
       

 06-02-2008
10.00
Engine cowling halves fitted
       

 05-28-2008
10.00
Engine cowling front
Details
       

 04-21-2008
10.00
Engine upper cowling installation
       

 03-27-2008
10.00
Fairing, wheel pant to leg, right
Details
       

 03-19-2008
10.00
Fairing, wheel pant to leg, left
       

 03-11-2008
10.00
Wheel pants
Details
       

 10-01-1994
99.00
Skeleton assembled
       

 11-20-1992
99.00
Ribs in jig
       

 10-08-1992
99.00
Right wing
     










Copyright © 2001-2024 Matronics. All Rights Reserved.