KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log

Builder:
Steven Lynn
Location:
Anacortes, WA - USA
Aircraft:
Vans - RV-7A
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Lycoming - IO-360
Prop:
-
Total Build Time:
1678 Hours

Welcome to Steve's RV-7A construction log for a Vans RV-7A experimental airplane. This website documents the construction. I'm documenting the assembly and mostly following the sequence in Van's plans. It helps me remember what I did and I hope other builders find some assistance from the experiences written up in this log. And friends, family, pilots and other interested folks can see how it's going.

Your emails are welcome and your interest is appreciated.

Recent Activity
 Date Hours Work Log Summary Details
 02-10-2019
0.5
Control Surfaces Range Of Motion-Elevator
Details
       

 02-10-2019
0.5
Control Surfaces Range Of Motion-Ailerons
Details
     

 02-09-2019
1.0
EMS Settings
Details
     

 01-31-2019
0.2
Ready To Fly 5
       

 01-31-2019
0.5
Ready To Fly 4
       

 01-31-2019
0.5
Ready To Fly 3
Details
       

 01-31-2019
0.5
Ready To Fly 2
Details
       

 01-31-2019
1.0
Ready To Fly 1
Details
       

 01-19-2019
1.0
Fuel Flow Test Final 1
Details
       

 01-13-2019
0.5
Top Cowl Repaint 2
Details
       










Copyright © 2001-2019 Matronics. All Rights Reserved.