Powered By Kitlog Pro v2.0
Russ Karnap
Builder:
Russ Karnap
Location:
Lake Worth, FL - USA
Aircraft:
Russ Karnap - RV-7A
Engine:
-
Prop:
-
Total Build Time:
682 Hours
Welcome to my Experimental Aircraft Web Site.
Recent Activity
Date
Hours
Work Log Summary
Details
07-27-2019
10.0
Right Wing - Z-Brackets
Details
07-26-2019
4.0
Drilled Backing Plate, Z-Brackets For Right Wing
Details
07-25-2019
2.0
Backing Strip
Details
07-24-2019
4.0
Right Wing - Match Drilled All Skins, Assembled LE
Details
07-23-2019
2.5
Match Drilled Right Top Wing Skins, Clecoed Right
Details
07-22-2019
4.0
Right Wing - Doubler And Cleco
Details
07-21-2019
8.5
Riveted Right Wing Skeleton
Details
07-20-2019
6.0
Prepped And Primed
Details
07-19-2019
2.0
Prepped Right Main Wing Ribs, Plates, And Brackets
Details
07-18-2019
1.0
Moved Left Wing To Stand
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
125
683
EAA Tech Counselor R
1
2
Emp: Elevators
18
97
Emp: Horizontal Stab
10
68
Emp: Rudder
9
51
Emp: Vertical Stabil
4
22
Empennage: General
2
5
Miscellaneous
1
1
Primer
4
22
Primer/Paint Prep
2
13
Shop Supplies
1
1
Tools
2
12
Wings
71
389
Copyright © 2001-2019 Matronics. All Rights Reserved.