KitLog pro

Powered By Kitlog Pro v2.0

Bearhawk #982

Builder:
Chris Silver
Location:
Hartselle, AL - USA
Aircraft:
scratch built - Bearhawk
Engine:
-
Prop:
-

Project Update: October 2008

Things appear to be back on track with the project. Honey-do's are currently out of the way and the other projects that I wanted/needed done are put to bed too.

State Of The Project:
-Nose, Center, Aileron, Flap, and Tip Ribs formed to final shape
-ALL other Rib Blanks routed to final size
-All jigs required to form Ribs are complete

Next steps include:
-Smooth/shape remaining rib blanks
-stiffener angles
-Alodine and prime

So, looking at this list, all I lack is finishing up! ;-)

-Chris Silver




Recent Activity
First Photo
Date

Work Log Summary

untweaked and tweaked
10-26-2008
Flap Nose Rib smoothing and forming
10-25-2008
Flap Nose Rib smoothing
In the blocks
10-24-2008
Aileron Pocket Ribs + joggles
The setup
10-24-2008
Aileron Nose Rib balance tube hole drilled
10-23-2008
Aileron Pocket Rib smoothing
10-22-2008
Aileron Nose Ribs
10-21-2008
My Formblock System - A how to (part 5)
10-21-2008
My Formblock System - A how to (part 4)
10-21-2008
My Formblock System - A how to (part 3)
10-21-2008
My Formblock System - A how to (part 2)











Copyright © 2001-2010 Matronics. All Rights Reserved.