KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-16-2011
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Vertical Stab Progress

-Prepped VS frame parts (ribs, spars, stiffener) – part edges and fluted ribs
-Match drilled rear spar assembly holes (spar, stiffener, rudder brackets)
-Assembled VS frame
-Drilled Rib/spar attach holes
-Got the VS skin out of the box
' style=

Rear spar assembled and drilled

Rear spar assembled and drilled

' style=

VS Skeleton assembled & drilled

VS Skeleton assembled & drilled

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.