KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
' style=
Date:  3-13-2022
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Aft Deck set

I finished cutting the spacers and loosely fitted the aft deck.

It took awhile to get the fuselage level fore and aft and across the longerons. Once done, I strapped it down with all the shims in place.

The aft deck was not level after getting the forward level and strapped down. A little manual manipulation of the aft fuselage got it level in both directions. I clamped it all down and started drilling.
' style=

Fuse level and strapped down

Fuse level and strapped down

' style=

Aft deck level and clampe

Aft deck level and clampe

' style=

Drill and cleco

Drill and cleco

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.