There were three more holes that needed to be drilled prior to taking everthing apart for prep prior to riveting. I had marked these earlier but had missed them in the long list of other pickups.
Two 7/16"holes for fittings for the vent lines in the bottom skin and a #12 hole through the bottom skin and firewall flange.