KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
' style=
Date:  1-22-2013
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Tie down holes

Not a lot of progress tonight. I opened up the tie down holes on the bottom of each leading edge. I used a few different drill bits to progressively open up the pilot hole until I could see where the tie down bracket was. It was nearly spot on. I used a stone bit in by die grinder to adjust the center to line up with the bracket better. I will leave the final hole diameter for when I have the Van’s tie downs in hand.
I dug out the Tank brackets and started edge finishing them, but I didn’t get too far. Like other’s I will use Dan Checkoway method for locating and drilling these brackets. I am still head scratching on this for now.
' style=

Opening up the tie down holes - right side

Opening up the tie down holes - right side

' style=

Opening up the tie down holes - Left side

Opening up the tie down holes - Left side

' style=

Fuel Tank Z brackets

Fuel Tank Z brackets

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.