Brief Description: Left Elevator skeleton riveting
The eplacement tip rib came in from Vans on Friday. Haven’t checked the fit yet.
I came down with a cold this weekend. Sat in my chair in front of the fire for the most part
Did a little clean up in the shop on Saturday
Was up for some work Sunday afternoon. Riveted the hinge doublers and nutplates to the spar. Riveted the tip rib to the counter balance rib. Completed the left elevator skeleton minus a couple rivets I needed the gun for (I ran out of gas).