Today I put in the remaining T1 tubes on the left elevator. This took quite a bit longer than I thought because they are tacked in such a tight spot in the ribs. I did get them in, but I even used my Meco torch in one spot because it was just way too tight for the TIG. I ran out of argon right when the last tube was welded in and my local supplier was OUT!!! Dang it. Have to wait until Monday to weld some more. For whatever reason, I didn't get a photo of the T1 tubes in place.
I did start laying out the right elevator and got the outside tubes fit along with the spar.