KitLog pro

Powered By Kitlog Pro v2.0

Alaskan Bearhawk
' style=
Date:  4-4-2017
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Pitot Tube Part 3

God bless Ron Jones for such great Kitlog pics of his pitot install! He bought the Gretz pitot mount kit, but had to make a bigger doubler. Looking at the pictures he posted and the installation templated I ended up with a plan. The pitot will go in the bay outside to the strut attach point and be accessible through that inspection panel. TImetot fabricate!
' style=

Location located

Location located

' style=

Making templates

Making templates

' style=

AL doublers cut

AL doublers cut

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.