Powered By Kitlog Pro v2.0
Georges Web Site
RV 10
All
3-7-2019
< Previous Log Entry
Next Log Entry >
Date:
3-7-2019
Number of Hours:
0.00
Manual Reference:
6-1 to 6-4 Step 5
Brief Description:
Initial prep of the Vertical Stabilizer
Initial Assembly of the Vertical Stabilizer
1) Did the initial deburring - started off slow but the scotch bright deburring wheel attached on the bench grinder was a huge help.
2) Did not radius the nose ribs enough and had some dimples show up - after I disassembled the unit, I did additional radiusing from the nose ribs
Spars and Ribs
Skins Cleco
All Primed and ready for Assembly
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV 10 Home
Category
# Logs
# Hours
All
7
0
Empennage
1
Horizontal Stab
1
Rudder
3
Vertical Stab
2
Copyright © 2001-2024 Matronics. All Rights Reserved.