KitLog pro

Powered By Kitlog Pro v2.0

Woody's Web site
' style=
Date:  7-21-2005
Number of Hours:  2.50
Manual Reference:  9.6
Brief Description:  Install LB Actuator and Hardpoints

Routed out the locations for the hardpoints. 2 15 ply BID were used from the NG30 buildups and sanded down to the appropriate thickness. The actuator was installed and everything clamped into place.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.