KitLog pro

Powered By Kitlog Pro v2.0

Woody's Web site
' style=
Date:  6-22-2005
Number of Hours:  2.00
Manual Reference:  9.2
Brief Description:  Install TE/ Sand Bulkheads

First metal tape was placed to build up a trailing edge. Then micro was filled and a two ply BID layup applied opposite the tape to construct a trailing edge
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.