KitLog pro

Powered By Kitlog Pro v2.0

Woody's Web site
' style=
Date:  8-2-2002
Number of Hours:  4.00
Manual Reference:  4.2, 4.3
Brief Description:  F22 aft layup, Instrument Panel Prep

The aft face of F22 was glassed with two plys of BID. The F22 doubler was then installed after applying micro and 2 plys of BID and 1 ply of UND were applied with 1" overlap onto F22. The foam for the instrument panel was prepped and two plys of BID, 1 UND for each side were measured and CUT
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.