I started preparing the inspection port backing rings for installation. I forgot the process I used on the other wing but luckily I made good notes in my Kitlog so I referenced them.
I've been wanting to run a TV cable to the garage so I could have a TV in the shop and as I was sitting there working on the backing flanges I decided to do it. Some times there's something on that I want to watch and now I don't have to leave to shop to watch it.