I was able to get a little work in today. I drilled and clecoed the left wing outboard rib to the spars. I riveted the # 8 nose rib attach angle to the main spar. The # 1 nose rib was positioned, drilled, clecoed and secured in place getting ready to line up the nose ribs on the left wing. To line up the nose rib correctly I drew a center line on the nose rib from the mylar drawing. I lined up the sides and leveled the nose rib. Now I just need to set the string and I'm ready for left wing nose ribs.