KitLog pro

Powered By Kitlog Pro v2.0

Waynes Bearhawks
< Previous Log Entry          Next Log Entry >
' style=
Date:  4-3-2011
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Left wing ready

"Back from Sun-n-fun, as disheartening an experience as it was, I was anxious to get back to work. I finished everything I needed to on the left wing. The left wing is now ready to pull off the jig. I think I'll wait until the right wing is done though.

I actually did a little work before we left for Sun-n-fun. The left main fuel tank plumbing is complete and installed. The inspection covers are done. I riveted the stiffeners on the main fuel tank cover and installed the cover. The parts for the landing light are riveted on. All hardware is torqued to proper settings.

Now on to the right wing..."
' style=

Left Wing Ready

Left Wing Ready

' style=

Main Tank Plumbing

Main Tank Plumbing

' style=

Plumbing at Wing Root

Plumbing at Wing Root

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.