I managed to get a little Bearhawk time in today. I welded the "T" in the flap push rod. I already had the bushing and tube that fits between the flap arms I just need to add the long tube for the push rod. I left it long so I can size it after I check final length on assembly.
Then I dinked around doing some general shop cleaning and organizing. I won't be doing any welding for a while so I moved that stuff out of the way. Then I just started looking things over thinking about what my next steps will be and making sure I had everything I need.