KitLog pro

Powered By Kitlog Pro v2.0

Waynes Bearhawks
' style=
Date:  12-2-2006
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Nose rib stiffener angle prep, epoxy prime nose ri

I drilled the holes for the nose rib stiffener angles. I then gave them the same preparation and Alodine treatment for priming. I epoxy primed the nose ribs and stiffener angles. I sprayed 2 light coats of epoxy primer. I actually used more than I anticipated so had to mix a couple of batches. I also realized I'm going to need more than I have on hand so I order more right away.
' style=

Drilling Rib Stiffener Angles with Guide

Drilling Rib Stiffener Angles with Guide

' style=

Parts Laid Out For Priming

Parts Laid Out For Priming

' style=

After Spraying Epoxy Primer

After Spraying Epoxy Primer

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.