Powered By Kitlog Pro v2.0
Demoted Priority
RV-8
All
1-7-2009
< Previous Log Entry
Next Log Entry >
Date:
1-7-2009
Number of Hours:
2.00
Manual Reference:
Brief Description:
Panel planning
A bit of panel planning today.
Lots to think about. I've spent many hours looking at glass and doing math!
This stuff adds up fast!
Anyway, this is my current thought.
IFR with the GNS 430, next gen Dynon, including their autopilot, D-10A on a seperate bus for redundant attitude, altitude and such.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
75
588
Empennage
31
161
Engine
1
Firewall Forward
3
8
Fuselage
32
206
Goodies
2
Instrument Panel
2
202
Interior
1
3
Quick Build Kit
2
Wings
1
8
Copyright © 2001-2024 Matronics. All Rights Reserved.