KitLog pro

Powered By Kitlog Pro v2.0

Davids Pipistrel Build Website
' style=
Date:  7-25-2021
Number of Hours:  8.00
Manual Reference:  
Brief Description:  installed and adjusted all control pushrods

Adjusted elevator control pushrod end so control stick was centered. Addjusted Aileron control rods so that flaperons were centered (lined up with fuselage). Checked travel and and flap angles, then loctited control rod ends and tightened locking nut. Installed and adjusted control stick aileron push rods, Loctited control rod ends and tightened locking nut. Zip tied control stick wires to keep them from tangling in control rods and then installed control sticks and loctited control stick bolts.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.