KitLog pro

Powered By Kitlog Pro v2.0

ULAY'S WEB SITE
' style=
Date:  1-20-2019
Number of Hours:  3.00
Manual Reference:  36-2
Brief Description:  Fabing brake lines

Fabricated and installed the right & left brake lines from the center tunnel to the brake line exit holes thru the Right and Left Landing Gear Mounts. Lots of "that looks about right" (TLAR) going on in this process.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.