KitLog pro

Powered By Kitlog Pro v2.0

THOMAS'S WEB SITE
' style=
Date:  9-9-2007
Number of Hours:  4.50
Manual Reference:  Chapter 7
Brief Description:  Right Tank Construction

Finished the right tank constuction. Drilled out the bad rivet on the inboard Z-bracket. Finished the riveting, Cut the two pot rivet shanks that failed to break at the correct place off. Screwed in the external tank 90. Installed the fuel pick up tube and screen. Installed the cork gasket with KW copper coat and installed the access cover. The right tank is ready for pressure testing. Leveled the skeleton and used three plumb bobs to square the frame. Had to adjust the frame to obtain square and level. The skeleton is now ready for final asymbly.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.