KitLog pro

Powered By Kitlog Pro v2.0

THOMAS'S WEB SITE
' style=
Date:  9-7-2007
Number of Hours:  4.25
Manual Reference:  Chapter 7
Brief Description:  Right Tank Construction

Sealed the right fuel tank tonight, what a night, I hate fuel tanks. Took over 4 hours to prep, seal, and rivet. Messed up on one rivet which I will drill out tomorrow and then I should be finished with the right tank. Sealed the gasket on with the opening cover. Still need to install the fuel pick up tube and screen. Waiting for the pro seal to set up first. Set the tank on the spar for the night so gravity will assist the pro seal to settle into the joint bettween the rear baffel and skin. Hope it sealed. I'll test it after a week or so with 4 psi of pressure. Enough for tonight.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.