Worked on the F-804A bulkhead. installed 4 plate nuts for assessories of piping attach points. Tomorrow I will drill the F-804B bulk head with the 3/4" holes to accomodate future electrical runs through the bulk head. This is base loosly on the new plans for the match drilled fuselage.