KitLog pro

Powered By Kitlog Pro v2.0

THOMAS'S WEB SITE
' style=
Date:  2-12-2012
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Fuselage asymble prep

Removed the landing gear weldments, set the plate nuts in the weldments. Removed the F-804A bulk head to debur and install the plate nuts for the seat rack. Drilled additional holes in the F-804A for electrical wires or what ever may be needed. Rechecked the alignment of the bulk heads for the final asymbly. Everything looks great. I'm very close to the final asymbly. I still need to counter sink / dimple the the flange on F-804 A and B for the rivets at the landing gear weldment. Additionally I need to final rivet the floor mounts to the F-804B and the last two rivets in the aft floor stiffners. Then Its time to begin the final riveting. Yeah....
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.