Powered By Kitlog Pro v2.0
THOMAS'S WEB SITE
RV8A
Fuselage
10-24-2010
< Previous Log Entry
Next Log Entry >
Date:
10-24-2010
Number of Hours:
5.00
Manual Reference:
section 8
Brief Description:
F824 side skin driling
Finally am confortable with the bulk head alignment and the level of the F887 longerons. I drilled the F887 to F824 on both sides. There are alot of holes to drill. So I'll continue tomorrow.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV8A Home
Category
# Logs
# Hours
All
553
1066
Electrical Component
20
69
Empennage
7
19
Fixtures
12
41
Fuel Tanks
46
60
Fuselage
387
743
Miscellaneous
3
3
Shop Organisation
10
1
Tools
8
10
Wings
60
120
Copyright © 2001-2024 Matronics. All Rights Reserved.