Brief Description: Riveting the trim tab spar to the elevator.
The bottom part of the trim tab spar was riveted in palace on the skin of the elevator. Again was done with the pneumatic squeezer for a quick job of it. The top half of this spar has the trim hinge attached so that comes later.