Powered By Kitlog Pro v2.0
Build Log
RV-9
All
5-15-2011
< Previous Log Entry
Next Log Entry >
Date:
5-15-2011
Number of Hours:
3.00
Manual Reference:
Manual 6-10
Brief Description:
Fibreglass work
Empennage fibreglass work:
Reinforced the insert part where the nutplates will be mounted with one layer of glass.
Fabricated plugs for HS. Put foam in slanted, then removed the material where there is no fairing (see picture).
Next: Continue with fibreglass
Reinforced strip.
Plugs for HS tips.
Foam plugs follow contour of the tips.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-9 Home
Category
# Logs
# Hours
All
307
872
Canopy
8
20
Empennage
98
284
Fuselage
136
386
Miscellaneous
1
3
Wings
64
179
Copyright © 2001-2024 Matronics. All Rights Reserved.