Powered By Kitlog Pro v2.0
Build Log
RV-9
All
3-31-2011
< Previous Log Entry
Next Log Entry >
Date:
3-31-2011
Number of Hours:
3.00
Manual Reference:
DWG 4; Manual 6-8
Brief Description:
Matchdrilled ribs and spars of the left elevator
Matchdrilled all holes in the left elevator main spar, trim spar, ribs, gusset, main skin and counterbalance skin. Fabricated gusset.
Next: Matchdrilling the elevator horn
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-9 Home
Category
# Logs
# Hours
All
307
872
Canopy
8
20
Empennage
98
284
Fuselage
136
386
Miscellaneous
1
3
Wings
64
179
Copyright © 2001-2024 Matronics. All Rights Reserved.