KitLog pro

Powered By Kitlog Pro v2.0

Build Log
' style=
Date:  1-28-2011
Number of Hours:  3.00
Manual Reference:  DWG 3; Manual 6-2
Brief Description:  Match drilled skin to skeleton

Match drilled the skin to the skeletal structure, enlarged the pre-punched 3/32 inch holes to #40.
Deburred holes in spars and ribs.


Next: Deburing of skins. Dimpling of ribs.
' style=

Deburred ribs

Deburred ribs

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.