Deburred the front and rear spar, front and rear spar doubler. Fabricated the HS jig for the left horizontal stabilizer: Cleckoed the front ribs to the skin, the front spar (with doubler), the main ribs and the rear spar. Fit of the prepunched holes is superb.
Next: Matchdrilling the skin to the spars and ribs.