KitLog pro

Powered By Kitlog Pro v2.0

Build Log
' style=
Date:  1-22-2011
Number of Hours:  1.00
Manual Reference:  DWG 3; Manual 6-1
Brief Description:  Matchdrill fwd HS spar and spar doubler

Clecoed the two HS-902 Front Spars and the HS-907 Front Spar Doubler Plate together.
Match drilled and enlarged the pre-punched 1/8" holes to #30.
' style=

Drilling fwd HS spar

Drilling fwd HS spar

' style=

All prepunched holes were matchdrilled

All prepunched holes were matchdrilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.