KitLog pro

Powered By Kitlog Pro v2.0

TAB'S WEB SITE
' style=
Date:  5-15-2011
Number of Hours:  1.25
Manual Reference:  06-04 & 06-05
Brief Description:  Rudder Spar - installed nutplates & prepped the ri

Installed the nutplates on the upper spar caps and the front spar with flush squeezed rivets. Started prepping the vertical stablizer ribs.
' style=

Upper Spar Nutplates.

Upper Spar Nutplates.

' style=

Flush side.

Flush side.

' style=

Prepping the ribs.

Prepping the ribs.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.