Seperated control lever parts. As per plans, cut to length the control pushrods for the elevators. Match drilled the bell crank parts for the elevator. Scotch brite all parts, alumi-prep, alodine, and primed bell crank, pushrods and push rod ends. Assembled pushrod parts. Marked described hole pattern. Drilled and clecoed together.