KitLog pro

Powered By Kitlog Pro v2.0

Tims Web Site
' style=
Date:  1-1-2015
Number of Hours:  8.50
Manual Reference:  
Brief Description:  Elevator parts before corrosion protection

1st picture shows prepared parts for Right elevator. 2nd picture is of Left elevator frame temporarily assembled to test parts for fit. 3rd picture is of Right elevator skin drilled deburred, and dimpled. All parts shown are ready for scotch brite, alumi-prep, aloding an priming befor final assembly. Next step before final assembly is to fit and size counter weights for both elevators.
' style=

Right elevator frame parts

Right elevator frame parts

' style=

Left Elevator frame an skin

Left Elevator frame an skin

' style=

Right elevator skin dimpled ready for final prep work

Right elevator skin dimpled ready for final prep work

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.