Brief Description: Elevator parts before corrosion protection
1st picture shows prepared parts for Right elevator. 2nd picture is of Left elevator frame temporarily assembled to test parts for fit. 3rd picture is of Right elevator skin drilled deburred, and dimpled. All parts shown are ready for scotch brite, alumi-prep, aloding an priming befor final assembly. Next step before final assembly is to fit and size counter weights for both elevators.
Right elevator frame parts
Left Elevator frame an skin
Right elevator skin dimpled ready for final prep work