KitLog pro

Powered By Kitlog Pro v2.0

Marks Rans Courier Project
' style=
Date:  6-26-2009
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Painting trim strips, fairings etc

I did some quick fitting work on the aileron push-pull tube fairings, then prepped them, the elevator control wishbone fairings, and all of the windshield trim pieces and attach hardware for primer/paint as appropriate. I was able to apply several coats of paint and have most of that work for the described parts completed.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.