KitLog pro

Powered By Kitlog Pro v2.0

TAB Aircraft LLC Web Site
' style=
Date:  7-8-2013
Number of Hours:  0.25
Manual Reference:  N/A
Brief Description:  Page 277 Wiring for a Viking Part 3

July 8 2013 continued.

Wiring for a Viking Part 3
' style=

I ran a 6awg ground wire from the battery to the Junction Block on the Avionics Tray

I ran a 6awg ground wire from the battery to the Junction Block on the Avionics Tray

' style=

I ran a 10awg ground wire from the Junction Block to the Terminal Block on the Avionics Tray

I ran a 10awg ground wire from the Junction Block to the Terminal Block on the Avionics Tray

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.