KitLog pro

Powered By Kitlog Pro v2.0

TAB Aircraft LLC Web Site
' style=
Date:  6-8-2013
Number of Hours:  0.30
Manual Reference:  N/A
Brief Description:  Page 264 Running the battery wire

June 8 2013 continued.

Running the battery wire

I ran the main battery wire that will be the starter and ground wire for the Viking Engine.

I ran the wire down the pylon to the left turtle deck arch, down to the floor, up to the front to the batteries and back down the right side to the bulkhead and up the right side turtle deck arch and up the pylon again.

The wire is the Copper Clad Aluminum Wire that is now being used by PA and Boeing. Its called Super-8-CCA from www.periheliondesign.com. It is a 6 gage wire with the same capability as a copper 4 gage wire and save weight.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.