KitLog pro

Powered By Kitlog Pro v2.0

TAB Aircraft LLC Web Site
' style=
Date:  9-15-2013
Number of Hours:  6.00
Manual Reference:  N/A
Brief Description:  Page 351 Painted Dash and Installed Panels

September 15 2013

Painted Dash and Installed Panels

During the drilling for the Blind Nuts and riveting them on, I marked up the paint job on the Dash. I repainted the Dash and let is sit outside all day in the sun to dry while I did some wiring.
I then installed the Dash on the plane and installed the 4 panels that I had ready to mount. I am still waiting for some parts for the Left Main before it will be ready.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.