Brief Description: Page 95 Preparing the Turtle Deck Part 4
November 1 2012
Preparing the Turtle Deck Part 4
Installed the Camloc Fasteners
After a month of not doing much on the SeaRey kit, I put some hours in today. I want to have the Turtle Deck carpeted and installed on the Hull by the Fly-in on the 11th.
I wet sanded the Turtle Deck and finally was satisfied with the look of the Stow-n-Go hatch flange. I then installed the Camloc Fasteners on the flange and test fitted the hatch with the Camlocs.