KitLog pro

Powered By Kitlog Pro v2.0

TAB Aircraft LLC Web Site
' style=
Date:  4-23-2013
Number of Hours:  0.75
Manual Reference:  S20- 18.1 to 18.4
Brief Description:  Page 233 Installed Aft Boom Tube Cover

April 34 2013

Section 20 Installed Aft Boom Tube Cover
Manual Ref:18.1 to 18.4

Located the center of the Boom Tube Cover and drilled a 3/16" hole in the center. Since the #10x 2/3" Sheet Metal Screw just fell into the hole, I figured that drilling a 3/16" hole into the Vertical Fin Trailing Edge as the Manual said, would be to big for the screw to thread into.

Placed the Boom Tube Cover on the aft end of the Boom Tube and drilled a 1/8" hole into the Vertical Fin Trailing Edge and installed the Boom Tube Cover.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.