Powered By Kitlog Pro v2.0
TAB Aircraft LLC Web Site
Searey LSX
Airframe
8-27-2012
< Previous Log Entry
Next Log Entry >
Date:
8-27-2012
Number of Hours:
3.00
Manual Reference:
S10- 8.1 to 14.4
Brief Description:
Page 55 Assembly of the Control Sticks
August 27 & 28 2012
Section 10. Assembly of the Control Sticks
Preparing for Assembly of the Control Sticks
Manual Ref: S10- 8.1 to 9.3
Installation of the Control Sticks
Manual Ref: S10- 10.1 to 10.3
Assembly of the Tie Rod Tubes, 8-14"
Manual Ref: S10- 11.1 to 11.7
Assembly of the Tie Rod Tubes to Bell Crank
Manual Ref: S10- 12.1 to 12.6
Assembly of the Tie Rod Tube, 21-5/8"
Manual Ref: S10-13.1 to 14.4
Assembling the Tie Rod Tubes
Assembly of the Tie Rod Tubes to Bell Crank
Installation of the Control Sticks
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Searey LSX Home
Category
# Logs
# Hours
All
546
800
Aircraft
7
2
Airframe
58
113
Avionics
45
86
Background
20
1
Brakes
5
4
Cockpit
67
130
Education
17
2
Engine
38
28
Exterior Trim
24
25
Fly-In/Party
7
Fuselage
5
9
Gear Assembly
21
22
Hull
12
19
Interior Trim
27
38
Miscellaneous
22
2
Modifications
42
72
None
1
Prop
5
4
Turtle Deck
16
32
Wings
42
80
Wiring
53
131
Work Shop/Hanger
12
Copyright © 2001-2024 Matronics. All Rights Reserved.