KitLog pro

Powered By Kitlog Pro v2.0

TAB Aircraft LLC Web Site
' style=
Date:  1-26-2013
Number of Hours:  1.00
Manual Reference:  N/A
Brief Description:  Page 166 Getting Ready to Paint 6

January 30 2013 continued.

Getting Ready to Paint 6

Hood stripe will be Gray Metallic.

Gray stripe on side starts at the front top

The stripe widens then becomes a stripe again at the bottom lower rear. Then a blue stripe starts in the wide area and goes to the back
' style=

Hood stripe will be Gray Metallic

Hood stripe will be Gray Metallic

' style=

Gray stripe on side starts at the front top

Gray stripe on side starts at the front top

' style=

The stripe widens then becomes a stripe again at the bottom  lower rear.

The stripe widens then becomes a stripe again at the bottom lower rear.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.