KitLog pro

Powered By Kitlog Pro v2.0

TAB Aircraft LLC Web Site
' style=
Date:  8-22-2012
Number of Hours:  1.00
Manual Reference:  N/A
Brief Description:  Page 54 Installing Bushings Part 1

September 1 2012

MODIFICATION NUMBER 8

Installing Bushings Part 1

I saw posts on the Searey Tech Site about the holes in the Aluminum Tubing that bolts went through, that had moving parts attached to had elongated with wear. Some Searey Builders had installed Bushings to keep that from happening.
I thought that was a good ideal. I got the web site from Bill Starkey who had done the modification and ordered the Bushings and got it in 2 days. I drilled the 1/4" holes out to 3/8" and pushed in the Bushings. Flanged Bushings for the Boom Tube and Sleeve Bushings for the Horn.
' style=

Got the Bushings from McMaster-Carr

Got the Bushings from McMaster-Carr

' style=

Before Bushings

Before Bushings

' style=

Bushings Installed

Bushings Installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.